Danh mục

A case-based reasoning approach for estimating the costs of pump station projects

Số trang: 7      Loại file: pdf      Dung lượng: 581.55 KB      Lượt xem: 10      Lượt tải: 0    
Thư Viện Số

Hỗ trợ phí lưu trữ khi tải xuống: 1,000 VND Tải xuống file đầy đủ (7 trang) 0

Báo xấu

Xem trước 2 trang đầu tiên của tài liệu này:

Thông tin tài liệu:

The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water) are collected to build a Case-Based Reasoning (CBR) library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.
Nội dung trích xuất từ tài liệu:
A case-based reasoning approach for estimating the costs of pump station projects

Tài liệu được xem nhiều: