Blockchain crowdsourced arbitration in construction project delay resolution
Số trang: 16
Loại file: pdf
Dung lượng: 1.02 MB
Lượt xem: 9
Lượt tải: 0
Xem trước 2 trang đầu tiên của tài liệu này:
Thông tin tài liệu:
A major matter in any industry, especially one with complicated stakeholder relationships like the construction industry, is dispute resolution. Blockchain technology, in the form of crowdsourced arbitration, may assist project stakeholders to conclude a verdict for any conflict including an argument over delay damage responsibility. This paper aims to propose a Blockchain-based methodology to facilitate small and medium project delay resolution demands on a timely and transparent basis.
Nội dung trích xuất từ tài liệu:
Blockchain crowdsourced arbitration in construction project delay resolution
Nội dung trích xuất từ tài liệu:
Blockchain crowdsourced arbitration in construction project delay resolution
Tìm kiếm theo từ khóa liên quan:
Civil engineering Contract management Liquidated delay damages The extension of time Contractor’s claim Crowdsourced arbitration Smart contractGợi ý tài liệu liên quan:
-
Ebook Civil engineering reference manual for the PE exam (7th edition): Part 1
627 trang 95 0 0 -
project management (10/e): part 2
604 trang 32 0 0 -
Particle Swarm Optimization using ε constraint-handling method developed in Python
7 trang 29 0 0 -
Compressibility characteristics of clays in the Red River Delta
17 trang 26 0 0 -
Bài giảng An toàn an ninh thông tin: Bài 9 - Bùi Trọng Tùng
13 trang 26 0 0 -
Ebook Advances in civil engineering and building materials IV
424 trang 25 0 0 -
Lecture Supply chain management - Chapter 3: Sourcing and procurement
46 trang 25 0 0 -
Ebook Rock mass classification: A practical approach in civil engineering - Part 2
132 trang 25 0 0 -
10 trang 24 0 0
-
Ebook Wavelet analysis in civil engineering: Part 2
92 trang 21 0 0