Ebook Construction project scheduling and control (Second edition): Part 1
Số trang: 242
Loại file: pdf
Dung lượng: 3.07 MB
Lượt xem: 16
Lượt tải: 0
Xem trước 10 trang đầu tiên của tài liệu này:
Thông tin tài liệu:
Ebook Construction project scheduling and control (Second edition): Part 1 include of the following contents: Chapter 1: introduction, chapter 2: bar (gantt) charts, chapter 3: basic networks, chapter 4: the critical path method (CPM), chapter 5: precedence networks, chapter 6: resource allocation and resource leveling, chapter 7: schedule updating and project control, chapter 8: schedule compression and time-cost trade-off.
Nội dung trích xuất từ tài liệu:
Ebook Construction project scheduling and control (Second edition): Part 1 construction project SALEH MUBARAK Construction Project Scheduling and Control Construction Project Scheduling and Control Second Edition Saleh Mubarak John Wiley & Sons, Inc. This book is printed on acid-free paper. 1 Copyright # 2010 by John Wiley & Sons, Inc. All rights reserved Published by John Wiley & Sons, Inc., Hoboken, New Jersey Published simultaneously in Canada This book was previously published by: Pearson Education, Inc. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning, or otherwise, except as permitted under Section 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, (978) 750-8400, fax (978) 646- 8600, or on the web at www.copyright.com. Requests to the Publisher for permission should be addressed to the Permissions Department, John Wiley & Sons, Inc., 111 River Street, Hoboken, NJ 07030, (201) 748-6011, fax (201) 748-6008, or online at www.wiley.com/go/permissions. Limit of Liability/Disclaimer of Warranty: While the publisher and the author have used their best efforts in preparing this book, they make no representations or warranties with respect to the accuracy or completeness of the contents of this book and specifically disclaim any implied warranties of merchantability or fitness for a particular purpose. No warranty may be created or extended by sales representatives or written sales materials. The advice and strategies contained herein may not be suitable for your situation. You should consult with a professional where appropriate. Neither the publisher nor the author shall be liable for any loss of profit or any other commercial damages, including but not limited to special, incidental, consequential, or other damages. For general information about our other products and services, please contact our Customer Care Department within the United States at (800) 762-2974, outside the United States at (317) 572-3993 or fax (317) 572-4002. Wiley also publishes its books in a variety of electronic formats. Some content that appears in print may not be available in electronic books. For more information about Wiley products, visit our web site at www.wiley.com. Library of Congress Cataloging-in-Publication Data: Mubarak, Saleh A. (Saleh Altayeb) Construction project scheduling and control/Saleh Mubarak. — 2nd ed. p. cm. Includes bibliographic references. ISBN 978-0-470-50533-5 (cloth) 1. Building industry—Management. 2. Building—Superintendence. 3. Production scheduling. I. Title. TH438.4.M83 2010 690.068—dc22 2008045989 Printed in the United States of America 10 9 8 7 6 5 4 3 2 1 To the soul of my father, a brilliant scholar and a noble person. He taught me the importance of knowledge, the art of teaching, and the spirit of giving. Best of all, he was a wonderful role model for me, being dedicated, altruistic, and humble. To my mother, who always showed me the value of education and discipline. To my wife, for her relentless encouragement, support, and patience during the years it took me to finish this book. Contents Preface xiii Preface to the First Edition xv Chapter 1 Introduction 1 Planning and Scheduling 2 Project Control 6 Why Schedule Projects? 6 The Scheduler 9 Scheduling and Project Management 10 Chapter 1 Exercises 10 Chapter 2 Bar (Gantt) Charts 13 Definition and Introduction 14 Advantages of Bar Charts 17 Disadvantages of Bar Charts 17 Chapter 2 Exercises 18 vii viii Contents Chapter 3 Basic Networks 21 Definition and Introduction 22 Arrow Networks 22 Node Networks 29 Comparison of Arrow and Node Networks 35 Networks versus Bar Charts 36 Time-Scaled Logic Diagrams 37 Chapter 3 Exercises 38 Chapter 4 The Critical Path Method (CPM) 43 Introduction 44 Steps Required to Schedule a Project 45 Supplemental Steps 50 Resource Allocation and Leveling 52 Beginning-of-Day or End-of-Day Convention 54 The CPM Explained through Examples 54 Logic and Constraints 75 Chapter 4 Exercises 76 Chapter 5 Precedence Networks 83 Definition and Introduction 84 The Four Types of Relationships 87 The Percent Complete Approach 88 Fast-Track Projects 89 A Parallel Predecessor? 90 CPM Calculations for Precedence Diagrams 91 Final Discussion 106 Chapter 5 Exercises 107 Chapter 6 Resource Allocation and Resource Leveling 111 Introduction 112 The Three Categories of Resources 112 What Is Resource Allocation? 1 ...
Nội dung trích xuất từ tài liệu:
Ebook Construction project scheduling and control (Second edition): Part 1 construction project SALEH MUBARAK Construction Project Scheduling and Control Construction Project Scheduling and Control Second Edition Saleh Mubarak John Wiley & Sons, Inc. This book is printed on acid-free paper. 1 Copyright # 2010 by John Wiley & Sons, Inc. All rights reserved Published by John Wiley & Sons, Inc., Hoboken, New Jersey Published simultaneously in Canada This book was previously published by: Pearson Education, Inc. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning, or otherwise, except as permitted under Section 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, (978) 750-8400, fax (978) 646- 8600, or on the web at www.copyright.com. Requests to the Publisher for permission should be addressed to the Permissions Department, John Wiley & Sons, Inc., 111 River Street, Hoboken, NJ 07030, (201) 748-6011, fax (201) 748-6008, or online at www.wiley.com/go/permissions. Limit of Liability/Disclaimer of Warranty: While the publisher and the author have used their best efforts in preparing this book, they make no representations or warranties with respect to the accuracy or completeness of the contents of this book and specifically disclaim any implied warranties of merchantability or fitness for a particular purpose. No warranty may be created or extended by sales representatives or written sales materials. The advice and strategies contained herein may not be suitable for your situation. You should consult with a professional where appropriate. Neither the publisher nor the author shall be liable for any loss of profit or any other commercial damages, including but not limited to special, incidental, consequential, or other damages. For general information about our other products and services, please contact our Customer Care Department within the United States at (800) 762-2974, outside the United States at (317) 572-3993 or fax (317) 572-4002. Wiley also publishes its books in a variety of electronic formats. Some content that appears in print may not be available in electronic books. For more information about Wiley products, visit our web site at www.wiley.com. Library of Congress Cataloging-in-Publication Data: Mubarak, Saleh A. (Saleh Altayeb) Construction project scheduling and control/Saleh Mubarak. — 2nd ed. p. cm. Includes bibliographic references. ISBN 978-0-470-50533-5 (cloth) 1. Building industry—Management. 2. Building—Superintendence. 3. Production scheduling. I. Title. TH438.4.M83 2010 690.068—dc22 2008045989 Printed in the United States of America 10 9 8 7 6 5 4 3 2 1 To the soul of my father, a brilliant scholar and a noble person. He taught me the importance of knowledge, the art of teaching, and the spirit of giving. Best of all, he was a wonderful role model for me, being dedicated, altruistic, and humble. To my mother, who always showed me the value of education and discipline. To my wife, for her relentless encouragement, support, and patience during the years it took me to finish this book. Contents Preface xiii Preface to the First Edition xv Chapter 1 Introduction 1 Planning and Scheduling 2 Project Control 6 Why Schedule Projects? 6 The Scheduler 9 Scheduling and Project Management 10 Chapter 1 Exercises 10 Chapter 2 Bar (Gantt) Charts 13 Definition and Introduction 14 Advantages of Bar Charts 17 Disadvantages of Bar Charts 17 Chapter 2 Exercises 18 vii viii Contents Chapter 3 Basic Networks 21 Definition and Introduction 22 Arrow Networks 22 Node Networks 29 Comparison of Arrow and Node Networks 35 Networks versus Bar Charts 36 Time-Scaled Logic Diagrams 37 Chapter 3 Exercises 38 Chapter 4 The Critical Path Method (CPM) 43 Introduction 44 Steps Required to Schedule a Project 45 Supplemental Steps 50 Resource Allocation and Leveling 52 Beginning-of-Day or End-of-Day Convention 54 The CPM Explained through Examples 54 Logic and Constraints 75 Chapter 4 Exercises 76 Chapter 5 Precedence Networks 83 Definition and Introduction 84 The Four Types of Relationships 87 The Percent Complete Approach 88 Fast-Track Projects 89 A Parallel Predecessor? 90 CPM Calculations for Precedence Diagrams 91 Final Discussion 106 Chapter 5 Exercises 107 Chapter 6 Resource Allocation and Resource Leveling 111 Introduction 112 The Three Categories of Resources 112 What Is Resource Allocation? 1 ...
Tìm kiếm theo từ khóa liên quan:
Construction project scheduling and control Ebook Construction project scheduling Construction project scheduling The critical path method Resource allocation Precedence networksGợi ý tài liệu liên quan:
-
Optimally stable matchings for resource allocations
13 trang 33 0 0 -
368 trang 30 0 0
-
Ebook Project management: A strategic managerial approach (Tenth edition) - Part 2
289 trang 19 0 0 -
Some considerations into Vietnam on the road to sustainable development
7 trang 18 0 0 -
10 trang 18 0 0
-
Resource allocation for wireless powered multi-pair two way relay networks
5 trang 16 0 0 -
Job service demand based resource allocation policy for cloud-fog computing environments
7 trang 13 0 0 -
Lecture Project management: A managerial approach – Chapter 9: Resource allocation
50 trang 13 0 0 -
Ebook Construction project scheduling and control (Second edition): Part 2
237 trang 12 0 0 -
13 trang 8 0 0