Handling Procedures for Equipment Contaminated with Depleted Uranium or Radioactive Commodities
Số trang: 47
Loại file: pdf
Dung lượng: 427.76 KB
Lượt xem: 14
Lượt tải: 0
Xem trước 5 trang đầu tiên của tài liệu này:
Thông tin tài liệu:
When it is necessary to add refrigerant to a system after a loss it indicates
that there is a leak in the system. The leak must be located, repaired and the
system leak tested. If the leak is found to be on the low side of the system the
repair can be made after the system has been ‘pumped down’ to a balance in
pressure. Do not draw in any air which contains moisture, especially where
hygroscopic ester oils are concerned, (for example R134a). Some oils are not
affected and accept the ingress of air and moisture, recovering after a vacuum
is drawn with a recovery unit....
Nội dung trích xuất từ tài liệu:
Handling Procedures for Equipment Contaminated with Depleted Uranium or Radioactive Commodities
Nội dung trích xuất từ tài liệu:
Handling Procedures for Equipment Contaminated with Depleted Uranium or Radioactive Commodities
Tìm kiếm theo từ khóa liên quan:
Gram-Negative Pathogenic Bacteria Antibiotics and Probiotics Abuse and Alternatives Shrimp Farming Aquaculture – BenefitsGợi ý tài liệu liên quan:
-
Mutual funds withdraw shield: performance or agency costs driver?
5 trang 24 0 0 -
8 trang 21 0 0
-
CAL POLY UNIVERSITY HOUSING APARTMENT GUIDE
15 trang 19 0 0 -
INTEREST RATE SWAPS: RISK AND REGULATION
11 trang 19 0 0 -
EU Funds 2013 - Transition to the next programming period 2014-2020
18 trang 19 0 0 -
Employers' Benefits From Workers' Health Insurance
39 trang 18 0 0 -
Three Lectures by Warren Buffett to Notre Dame Faculty, MBA Students and Undergraduate Students
48 trang 16 0 0 -
Evaluation of antibacterial effects of bile salt on pathogenic bacteria - An in vitro study
7 trang 16 0 0 -
Guidance to assist organisers of Small Events
27 trang 15 0 0 -
Classification and mechanism of bacteriocin induced cell death: A review
10 trang 14 0 0