Danh mục

National Skills Bulletin 2009

Số trang: 107      Loại file: pdf      Dung lượng: 0.00 B      Lượt xem: 11      Lượt tải: 0    
Xem trước 10 trang đầu tiên của tài liệu này:

Thông tin tài liệu:

Growth in MCFC shipments is expected for 2012; FCE can currently manufacture up to 90 MW per year at its plant in Connecticut and as of 30 April 2012 its backlog stood at 52.4 MW. In Korea in particular, where there have been a number of megawatt-class installations already, demand for fuel cell baseload power is growing rapidly and delivery of stacks to POSCO Energy under a 70 MW order has been accelerated. The Seoul Metropolitan Government intends to install 50 MW of distributed fuel cell power in 2012, mainly to support the subway system, towards a target total for...
Nội dung trích xuất từ tài liệu:
National Skills Bulletin 2009

Tài liệu được xem nhiều: