This Specification section addresses requirements and procedures for concrete work which
shall include, but not be limited to, preparing concrete mixes of different classes,
transporting and placing on prepared surfaces or in pre-prepared forms, including supplying
and fixing of temporary and permanent formwork; vibrating, tamping and curing. This
Specification section shall be applicable to all concrete and concrete construction including
cast-in-place concrete elements, precast concrete members and pre-stressed concrete works....
Nội dung trích xuất từ tài liệu:
SECTION 06100 - CONCRETE AND CONCRETE STRUCTURES
DIVISION 6 CONCRETE AND CONCRETE STRUCTURES Concrete and Concrete StructuresSection 06100
SECTION 06100 - CONCRETE AND CONCRETE STRUCTURES
TABLE OF CONTENTS
1. DESCRIPTION .................................................................................................................................................1
2. STANDARDS AND CODES.............................................................................................................................1
3. MATERIALS .....................................................................................................................................................2
3.1 General 2
3.2 Cement 2
3.3 Aggregate 3
3.3.1 FINE AGGREGATES ..............................................................................................................................................4
3.3.2 COARSE AGGREGATE ..........................................................................................................................................5
3.4 Water for Concrete Mixing and Curing.............................................................................................................6
3.5 Admixtures.........................................................................................................................................................6
4. CONCRETE CLASSES.....................................................................................................................................7
4.1 General 7
4.2 Class Requirements ..........................................................................................................................................7
PREPARED BY N.D.TOAN
4.2.1 USES OF DIFFERING CLASSES OF CONCRETE ...........................................................................................................8
5. MIX DESIGNS ..................................................................................................................................................8
5.1 Samples 8
5.2 Mix Design .......................................................................................................................................................8
5.3 Adjustments During Progress of Work ............................................................................................................9
5.4 Contents of Chlorides and Sulphates..................................................................................................................9
6. WATER CEMENT RATIO..........................................................................................................................10
7. TESTING..........................................................................................................................................................10
7.1 Slumps 11
8. FORMWORK...................................................................................................................................................11
8.1 Design 11
8.2 Construction ...................................................................................................................................................12
8.3 General Requirements......................................................................................................................................12
9. CONCRETING.................................................................................................................................................13
9.1 General 13
9.2 Placing and Compacting...................................................................................................................................14
9.3 Weather Precautions .......................................................................................................................................15
TECHNICAL SPECIFICATIONS DIVISION 6 Created on 18/04/2000 16:05:00 ...