Danh mục

Summary of doctoral dissertation: Effect of initial physical properties of roller compacted concrete to construction schedule of concrete gravity dam in Vietnam

Số trang: 27      Loại file: pdf      Dung lượng: 842.21 KB      Lượt xem: 7      Lượt tải: 0    
Hoai.2512

Xem trước 3 trang đầu tiên của tài liệu này:

Thông tin tài liệu:

This study focus on the behaviour and quantify initial physical properties of RCC, from the beginning of hydration to designated characteristic of RCC, in order to define the thermal evolution, thermal stresses. By doing this, the appropriate speed of construction can be established when building RCC dam project.
Nội dung trích xuất từ tài liệu:
Summary of doctoral dissertation: Effect of initial physical properties of roller compacted concrete to construction schedule of concrete gravity dam in Vietnam

Tài liệu được xem nhiều:

Gợi ý tài liệu liên quan: