Barriers of Last Planner System: A Survey in Vietnam Construction Industry
Số trang: 8
Loại file: pdf
Dung lượng: 784.86 KB
Lượt xem: 13
Lượt tải: 0
Xem trước 2 trang đầu tiên của tài liệu này:
Thông tin tài liệu:
This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire.
Nội dung trích xuất từ tài liệu:
Barriers of Last Planner System: A Survey in Vietnam Construction Industry See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/264171455 Barriers of Last Planner System: A Survey in Vietnam Construction Industry Article · December 2013 DOI: 10.6106/JCEPM.2013.3.4.005 CITATIONS READS 5 588 2 authors: Ha Duy Khanh Soo Yong Kim University of Technical Education Ho Chi Minh Pukyong National University 11 PUBLICATIONS 93 CITATIONS 58 PUBLICATIONS 628 CITATIONS SEE PROFILE SEE PROFILE Some of the authors of this publication are also working on these related projects: Thesis View project All content following this page was uploaded by Soo Yong Kim on 13 September 2014. The user has requested enhancement of the downloaded file. KICEM Journal of Construction Engineering and Project Management www.jcepm.org Online ISSN 2233-9582 http://dx.doi.org/10.6106/JCEPM.2013.3.4.005 Barriers of Last Planner System: A Survey in Vietnam Construction Industry Ha Duy Khanh1 and Soo Yong Kim2 Received January 17, 2013 / Revised July 17, 2013 / Accepted August 26, 2013 Abstract: Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to ‘owner – contractor’ pair with 77.1% importance indices; whereas the lowest belongs to ‘consultants – contractors’ pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained. Keywords: Lean Construction, Last Planner, Planning and Control, Construction Workflow, Vietnam I. INTRODUCTION and tools such as Last Planner have been tested in the field and refined over last decade [28]. Formoso and Significant amounts of project values have been lost Moura (2009) has claimed that a multitude of due to weak management, defective design, poor quality publications focus on the success of Last Planner, and of work, inferior working conditions, poor safety indicated that the success of this tool is due to the way it arrangement, etc [23]. In reality, many methods have been manages the commitments [14]. used to search for new techniques and tools that can Based on above discussion, two objectives of this study guarantee the organizational competitiveness in the long are as follows: (1) evaluate the level of importance of the run through the systematic decrease of losses and LPS in current construction performance; and (2) analyze wastefulness, improvement of the product quality, and the existing barriers when using the LPS processes in the improvement of the environmental and safety conditions VCI. In this paper, the selected construction projects for [22]. In this context, Last Planner System (LPS) was studying are been under execution phase. The outcome of adopted as a very useful tool for the management of the this study would help professionals for improvement in construction process, and continuous monitoring of the planning and managing the construction schedule for all planning efficiency [3]. ...
Nội dung trích xuất từ tài liệu:
Barriers of Last Planner System: A Survey in Vietnam Construction Industry See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/264171455 Barriers of Last Planner System: A Survey in Vietnam Construction Industry Article · December 2013 DOI: 10.6106/JCEPM.2013.3.4.005 CITATIONS READS 5 588 2 authors: Ha Duy Khanh Soo Yong Kim University of Technical Education Ho Chi Minh Pukyong National University 11 PUBLICATIONS 93 CITATIONS 58 PUBLICATIONS 628 CITATIONS SEE PROFILE SEE PROFILE Some of the authors of this publication are also working on these related projects: Thesis View project All content following this page was uploaded by Soo Yong Kim on 13 September 2014. The user has requested enhancement of the downloaded file. KICEM Journal of Construction Engineering and Project Management www.jcepm.org Online ISSN 2233-9582 http://dx.doi.org/10.6106/JCEPM.2013.3.4.005 Barriers of Last Planner System: A Survey in Vietnam Construction Industry Ha Duy Khanh1 and Soo Yong Kim2 Received January 17, 2013 / Revised July 17, 2013 / Accepted August 26, 2013 Abstract: Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to ‘owner – contractor’ pair with 77.1% importance indices; whereas the lowest belongs to ‘consultants – contractors’ pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained. Keywords: Lean Construction, Last Planner, Planning and Control, Construction Workflow, Vietnam I. INTRODUCTION and tools such as Last Planner have been tested in the field and refined over last decade [28]. Formoso and Significant amounts of project values have been lost Moura (2009) has claimed that a multitude of due to weak management, defective design, poor quality publications focus on the success of Last Planner, and of work, inferior working conditions, poor safety indicated that the success of this tool is due to the way it arrangement, etc [23]. In reality, many methods have been manages the commitments [14]. used to search for new techniques and tools that can Based on above discussion, two objectives of this study guarantee the organizational competitiveness in the long are as follows: (1) evaluate the level of importance of the run through the systematic decrease of losses and LPS in current construction performance; and (2) analyze wastefulness, improvement of the product quality, and the existing barriers when using the LPS processes in the improvement of the environmental and safety conditions VCI. In this paper, the selected construction projects for [22]. In this context, Last Planner System (LPS) was studying are been under execution phase. The outcome of adopted as a very useful tool for the management of the this study would help professionals for improvement in construction process, and continuous monitoring of the planning and managing the construction schedule for all planning efficiency [3]. ...
Tìm kiếm theo từ khóa liên quan:
Barriers of Last Planner System Construction Industry Lean Construction Last Planner Planning and Control Construction WorkflowTài liệu liên quan:
-
Master Thesis in Economics: Digital marketing in the Irish construction industry
123 trang 27 0 0 -
Vietnam general contractors' perceptions on challenges to the delivery of green building projects
13 trang 15 0 0 -
Ebook Risk and insurance in construction (Second edition): Part 1
222 trang 15 0 0 -
Modeling the heterogeneity in contractors' mark-up behavior
10 trang 14 0 0 -
439 trang 14 0 0
-
Bài giảng Quản lý xây dựng: Chương 4 - TS. Nguyễn Duy Long
29 trang 14 0 0 -
209 trang 12 0 0
-
Construction Process Planning and Management: An Owner ' s Guide to Successful Projects
392 trang 12 0 0 -
336 trang 11 0 0
-
Causes of safety risk during tower crane operations on construction sites in Vietnam
13 trang 10 0 0