Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
Số trang: 11
Loại file: pdf
Dung lượng: 285.87 KB
Lượt xem: 18
Lượt tải: 0
Xem trước 2 trang đầu tiên của tài liệu này:
Thông tin tài liệu:
In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects have met delays and cost overruns. The research "Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries" has employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts
Nội dung trích xuất từ tài liệu:
Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
Nội dung trích xuất từ tài liệu:
Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
Tìm kiếm theo từ khóa liên quan:
Bài viết nghiên cứu khoa học Large construction projects Cost overruns Factor analysis Vietnam large construction projects Delay and cost overrunsTài liệu liên quan:
-
6 trang 224 0 0
-
Constraints on preinflation fluctuations in a nearly flat open ΛCDM cosmology
8 trang 131 0 0 -
Hành trình tiếp nhận chủ nghĩa Mác – Lênin và tìm ra con đường cứu nước của Chủ tịch Hồ Chí Minh
5 trang 115 0 0 -
Đổi mới đào tạo ngành Tài chính – Ngân hàng ở Việt Nam: Thực tiễn và bài học kinh nghiệm
6 trang 105 0 0 -
Đánh giá hiệu năng trong mạng có kết nối không liên tục DTN
8 trang 94 0 0 -
4 trang 83 0 0
-
7 trang 69 0 0
-
Cội nguồn khát vọng xây dựng đất nước giàu mạnh trong tư tưởng Hồ Chí Minh
6 trang 63 0 0 -
Phương pháp giảng dạy đối với học phần Kế toán tài chính 1
8 trang 59 0 0 -
7 trang 51 0 0