Danh mục

Integrating Post-Evaluation into Project Cycle Management for Road Infrastructure Projects in Vietnam

Số trang: 16      Loại file: pdf      Dung lượng: 825.10 KB      Lượt xem: 10      Lượt tải: 0    
Hoai.2512

Hỗ trợ phí lưu trữ khi tải xuống: 4,000 VND Tải xuống file đầy đủ (16 trang) 0

Báo xấu

Xem trước 2 trang đầu tiên của tài liệu này:

Thông tin tài liệu:

In Vietnam, project cycle management (PCM) of road investment projects consists of investment preparation, implementation, construction, and operation processes. The postevaluation of projects during operation has not yet been considered through PCM in a systematic and effective manner. This paper discussed project management issues of road infrastructure projects in Vietnam. Then the paper introduced the post-evaluation process for integrating into Vietnam’s PCM using the PCM methodology developed by Foundation for Advanced Studies on International Development (FASID). The National Highway No.5 Improvement Project was used as a case study for demonstrating applicability of the proposed procedure.
Nội dung trích xuất từ tài liệu:
Integrating Post-Evaluation into Project Cycle Management for Road Infrastructure Projects in Vietnam

Tài liệu được xem nhiều: