Study and analysis of project risk, market risk and firm risk
International Journal of Management (IJM)
Volume 10, Issue 1, January-February 2019, pp. 94-103, Article ID: IJM_10_01_013
Available online at http://www.iaeme.com/ijm/issues.asp?JType=IJM&VType=10&IType=1
Journal Impact Factor (2019): 9.6780 (Calculated by GISI) www.jifactor.com
ISSN Print: 0976-6502 and ISSN Online: 0976-6510
© IAEME Publication
STUDY AND ANALYSIS OF PROJECT RISK,
MARKET RISK AND FIRM RISK
Dr. Giriraj Kiradoo
Associate Professor in MBA,
Government Engineering College Bikaner, Bikaner Area, India
ABSTRACT
This work aimed to study and analysis the various risk associated with different
environment. The selected method consists of market risks and operating risks. The
approach used in this paper is proved to be practical and useful in the decision-making
process of capital budgeting and investment because each value corresponds to a
specific risk measures, so that a specific risk component can be managed to an
acceptable risk level.
Keywords: Project Risk, Market Risk and Firm Risk
Cite this Article: Dr. Giriraj Kiradoo, Study and Analysis of Project Risk, Market
Risk and Firm Risk, International Journal of Management, 10 (1), 2019, pp. 94-103.
http://www.iaeme.com/IJM/issues.asp?JType=IJM&VType=10&IType=1
1. INTRODUCTION
It is a well-established undeniable fact that each project involves risk. Moreover, it's a observe
to incorporate a brief outline of project risks within the project appraisal report. There are sure
projects that economic advantages are often quantified whereas, for others, such quantification
isn't doable. The firm risk stems from a technological modification in production method,
managerial unskillfulness, the availability of raw material, labor issues and changes in
consumer preferences. The financial risk considers the distinction between EBIT (Earnings
before Interest and Taxes) and EBT (Earnings before Tax) whereas business risk causes the
variations between revenue and EBIT. These are ways that and suggests that to scale back the
project risks.
http://www.iaeme.com/IJM/index.asp 94 editor@iaeme.com
Study and Analysis of Project Risk, Market Risk and Firm Risk
Table 1 EBT and EBIT
2. ANALYSIS OF PROJECT RISKS
It is the traditional observe to incorporate a brief outline of project risks in every appraisal
report. The aim of this chapter is to produce an outline of project risks so as to assist guarantee
uniformity and consistency in appraisal reports.
• Relates to comes that economic advantages may be quantified and
• Deals with comes that such quantification isn't potential.
2.1. Projects with quantified benefits
The economic internal rate of return (EIRR) is that the measure most frequently accustomed
indicates the economic viability of financed projects. Calculation of the EIRR needs a collection
of assumptions concerning the conditions faced by the project that within the judgment of the
appraisal mission ar presumably to prevail throughout its life. However, since bank-financed
projects ordinarily have an awfully long life, the conditions faced by the project could
amendment for a spread of reasons. Sensitivity analysis is, therefore, allotted to work out the
results of attainable changes within the values of key variables (costs, yields, and value of inputs
and outputs) on the project's EIRR
The number of risks facing a project may be massive, and it's neither attainable nor
fascinating to spot all attainable risks related to a project. The risks mentioned within the
appraisal report should basically be those that entail major economic consequences. These
should be known from the sensitivity analysis and represented in descendant order of
importance with reference to their impact on the EIRR
http://www.iaeme.com/IJM/index.asp 95 editor@iaeme.com
Dr. Giriraj Kiradoo
Figure 1 Economic internal rate of return (EIRR)
Particular attention should be paid to risks that might considerably cut back the project's
EIRR or render the project uneconomic by reducing its EIRR below the chance price of capital.
During this context, each of the base-case EIRR and also the sensitivity indicators are relevant.
If the base-case EIRR is high, the discussion of project risks should usually embrace risks to
that the project is extremely sensitive. For instance, the EIRR of most projects is extremely
sensitive to changes in project output, which can successively rely upon a variety of factors. A
discussion of the safeguards employed to reduce the risk of the outputs falling considerably
below the extent expected should thus be enclosed. For instance, in an irrigation project,
excluding the supply of water, the output could rely upon the availability of different inputs,
provision of extension services, and the effectiveness of water management by farmer's teams,
and accessibility of adequate infrastructure and storage facilities. Measures taken to confirm
adequate and timely accessibility of every should be in brief explained
Risks are clearly larger in projects that the base-case EIRR is simply marginally above the
chance cost of capital. These larger risks are even larger if the EIRR is extremely sensitive to
changes in key variables since even a little reduction within the EIRR would render the project
unviable. Even once the EIRR is comparatively insensitive to changes in key variables, combos
of adverse changes would possibly simply have an effect on the project's viability. Thus, in
such cases, the remedial action planned or adopted should be totally explained
If the ...