Danh mục

IBM Systems Director Events Reference Version 6.3.0

Số trang: 308      Loại file: pdf      Dung lượng: 1.23 MB      Lượt xem: 18      Lượt tải: 0    
tailieu_vip

Phí tải xuống: 1,000 VND Tải xuống file đầy đủ (308 trang) 0
Xem trước 10 trang đầu tiên của tài liệu này:

Thông tin tài liệu:

Performance-to-plan assessments realize the implications of John Carver’s opening quote: Organizational performance is synonymous with chief executive performance. The approach in this case is that the board, with information from the executive and staff, sets organization-wide goals annually, consistent with the strategic plan and the policies it has developed. These are broad goals, achievable through a variety of means and through a coordination of the organization’s activities. To the degree pos- sible, measurable but realistic results are specified. For example, the goal might be to generate a three percent surplus at fiscal year end. Usually, the manner in which the measurable result...
Nội dung trích xuất từ tài liệu:
IBM Systems Director Events Reference Version 6.3.0

Tài liệu được xem nhiều: