Lecture Information technology project management (Eighth Edition): Chapter 4
Thông tin tài liệu:
Nội dung trích xuất từ tài liệu:
Lecture Information technology project management (Eighth Edition): Chapter 4 Information Technology Project Management, Eighth Edition Note: See the text itself for full citations. Describe an overall framework for project integration management as it relates to the other project management knowledge areas and the project life cycle Discuss the strategic planning process and apply different project selection methods Explain the importance of creating a project charter to formally initiate projects Describe project management plan development, understand the content of these plans, and review approaches for creating them Information Technology Project Management, Eighth Edition Copyright 2016 2 Explain project execution, its relationship to project planning, the factors related to successful results, and tools and techniques to assist in directing and managing project work Describe the process of monitoring and controlling a project Understand the integrated change control process, planning for and managing changes on information technology (IT) projects, and developing and using a change control system Explain the importance of developing and following good procedures for closing projects Describe how software can assist in project integration management Information Technology Project Management, Eighth Edition Copyright 2016 3 Project managers must coordinate all of the other knowledge areas throughout a project’s life cycle Many new project managers have trouble looking at the “big picture” and want to focus on too many details (See opening case for a real example) Project integration management is not the same thing as software integration Information Technology Project Management, Eighth Edition Copyright 2016 4 1. Developing the project charter involves working with stakeholders to create the document that formally authorizes a project—the charter. 2. Developing the project management plan involves coordinating all planning efforts to create a consistent, coherent document—the project management plan. 3. Directing and managing project work involves carrying out the project management plan by performing the activities included in it. Information Technology Project Management, Eighth Edition Copyright 2016 5 Monitoring and controlling project work involves overseeing activities to meet the performance objectives of the project Performing integrated change control involves identifying, evaluating, and managing changes throughout the project life cycle. Closing the project or phase involves finalizing all activities to formally close the project or phase. Information Technology Project Management, Eighth Edition Copyright 2016 6 Information Technology Project Management, Eighth Edition Copyright 2016 7 The Surrey police force began looking into replacing its criminal intelligence system in 2005, but the project was finally cancelled in 2013, and the old system was replaced with a much less expensive one used by thirteen other forces The person in charge of the project would not take responsibility for it An audit report said the project was beyond their in-house capabilities and experience Organizations must make the right staffing/outsourcing decisions Information Technology Project Management, Eighth Edition Copyright 2016 8 Strategic planning involves determining long-term objectives, predicting future trends, and projecting the need for new products and services Organizations often perform a SWOT analysis ◦ analyzing Strengths, Weaknesses, Opportunities, and Threats As part of strategic planning, organizations ◦ identify potential projects ◦ use realistic methods to select which projects to work on ◦ formalize project initiation by issuing a project charter Information Technology Project Management, Eighth Edition Copyright 2016 9 Information Technology Project Management, Eighth Edition Copyright 2016 10 Information Technology Project Management, Eighth Edition Copyright 2016 11 A 2013 survey identified companies most admired for their ability to apply IT-related business capabilities for competitive advantage Best practices of these companies include: ◦ Customer-driven IT is essential ◦ IT can enable branding and customer recruitment ◦ Keep improving Information Technology Project Management, Eighth Edition Copyright 2016 12 There are usually more projects than available time and resources to implement them Methods for selecting projects include: ◦ focusing on broad organizational needs ◦ categorizing information technology projects ◦ performing net present value or other financial analyses ◦ using a weighted scoring model ◦ implementing a balanced scorecard Information Technology Project Management, Eighth Edition Copyright 2016 ...
Tìm kiếm theo từ khóa liên quan:
Lecture Information technology project management Project management Information technology project management Information technology project Strategic planning processTài liệu cùng danh mục:
-
711 câu hỏi trắc nghiệm Quản trị dự án đầu tư
62 trang 869 10 0 -
Giáo trình Quản lý dự án phần mềm: Phần 2 - Phạm Ngọc Hùng
216 trang 398 0 0 -
Thuyết minh Dự án đầu tư Nhà máy sản xuất gạch không nung Thanh Thái
51 trang 360 3 0 -
Thuyết minh Dự án đầu tư nhà máy sản xuất nước tinh khiết
35 trang 321 8 0 -
Chỉ tiêu đánh giá hiệu quả đầu tư mà bạn cần biết
6 trang 268 0 0 -
Giáo trình Thẩm định dự án đầu tư: Phần 2
97 trang 251 1 0 -
7 trang 239 0 0
-
52 trang 233 0 0
-
Sổ tay hướng dẫn sử dụng công cụ sàng lọc dự án đầu tư
21 trang 226 0 0 -
Thuyết minh dự án đầu tư: Sân Golf Phúc Tiến
66 trang 223 3 0
Tài liệu mới:
-
Khảo sát tình trạng dinh dưỡng trước mổ ở người bệnh ung thư đại trực tràng
9 trang 20 0 0 -
94 trang 18 0 0
-
Tham vấn Thanh thiếu niên - ĐH Mở Bán công TP Hồ Chí Minh
276 trang 19 0 0 -
Kết hợp luân phiên sóng T và biến thiên nhịp tim trong tiên lượng bệnh nhân suy tim
10 trang 18 0 0 -
Đề thi giữa học kì 1 môn Ngữ văn lớp 9 năm 2024-2025 có đáp án - Trường THCS Nguyễn Trãi, Thanh Khê
14 trang 20 0 0 -
Đánh giá hiệu quả giải pháp phát triển thể chất cho sinh viên Trường Đại học Kiến trúc Hà Nội
8 trang 18 0 0 -
Tỉ lệ và các yếu tố liên quan đoạn chi dưới ở bệnh nhân đái tháo đường có loét chân
11 trang 19 0 0 -
39 trang 18 0 0
-
Đề thi học kì 1 môn Tiếng Anh lớp 6 năm 2024-2025 có đáp án - Trường TH&THCS Quang Trung, Hội An
6 trang 18 1 0 -
Tôm ram lá chanh vừa nhanh vừa dễRất dễ làm, nhanh gọn mà lại ngon. Nhà mình
7 trang 18 0 0